Training for the Turbine Control System ARS-TSControl of the System-Engineers from TP-HPP “Novi Sad”
Part of the "Modernization of regulation and protection of the turbo-aggregate TA-2" project, was a four-day (from 6th to 9th April, 2015) training for system engineers from Thermal-heating power plant [...]
