In the list of selected references only a small part of recent projects and products realized by our experts is stated. Although it comprises just a small segment of our achievements, since foundation of the Institute and up to day, it fully illustrates diversity of research, development and programs nurtured in the Institute Mihailo Pupin.
– PROCESS CONTROL
– TRAFFIC MANAGEMENT
– INFORMATION SYSTEMS
– EXPERT AND DECISION SUPPORT SYSTEMS
– COMPUTER NETWORKS AND COMPUTER SYSTEMS IN LARGE INFORMATION SYSTEMS
– ACCESS CONTROL AND VIDEO SURVEILLANCE SYSTEMS
– S,A&W SYSTEMS
– SPECIAL PURPOSE SYSTEMS
– TELECOMMUNICATIONS
This list represents consolidated references of all Institute’s companies.
Year | Contractor | Description |
2021 | Siemens doo Beograd | Development of technological process simulator and simulator for DCS control system of block B3 at TPP Kostolac B |
2021 | ODS “EPS Distribucija”, Beograd | Implementation and installation of SCADA MV systems |
2021 | AD Elektromreža Srbije, Beograd | Maintenance and software support to control system |
2021 | AD Elektromreža Srbije, Beograd | Upgrade of Atlas-Max-RTL local and remote control system |
2020 | PE Elektroprivreda Srbije Beograd Branch HPP Djerdap | Reconstruction and modernization of equipment at the central command of HPP Djerdap 1 |
2020 | Crnogorski elektroprenosni sistem AD Podgorica | Upgrade of SCADA system in National Dispatching Center |
2020 | PE Putevi Srbije Beograd | Maintenance of equipment, systems and installations for tunnel management on the K10, K11 and Belgrade bypass |
2020 | Hidro-Tan d.o.o. Beograd | Control System for MHPP Rekovići |
2020 | Elektrozapad d.o.o. Beograd | Delivery, installation and comisioning of a new block of the Cardiovascular Diseases Instiute “Dedinje” – BMS |
2020 | PE Elektroprivreda Srbije Beograd | Delivery of equipment, testing, training and commissioning for the reconstruction of the system of own consumption HPP “Zvornik” – Stage 2 |
2020 | MHPP ERS Trebinje Hidroelektrane na Drini | SCADA system – adaptation for the transition of the existing auxiliary plants to the new control system of the HPP Višegrad |
2020 | PE EPS Branch TPPNT Obrenovac | Reconstruction of the pumping station control system |
2020 | PE Elektroprivreda Srbije Beograd | Modernization of the process data collection system |
2020 | TRANSYS spol. s r.o | Electrical part of the Ash handling system at TPP Kostolac B3 |
2020 | PE EPS Branch TENT Obrenovac | Project documentation and execution of works on the construction of the Desulphurization plant at TPPNT B |
2019 | ODS “EPS Distribucija” Beograd | Construction of dispatch center with delivery and installation of equipment and preparation of project documentation |
2019 | ODS “EPS Distribucija” Beograd | Dispatcher Training Simulator Software Tool |
2019 | China Machinery Engineering Corporation, Beograd | Production and delivery of control system and instrumentation for oil pump for phase II of Kostolac B Thermal Power Plant Project |
2019 | PE EPS Branch TE-KO Kostolac | Simulator for control system with PLC PUPIN |
2019 | PE Elektroprivreda Srbije Beograd Branch HPP Djerdap | Reconstruction of PL1 and XW5E cabinets at the additional plant (HPP Đerdap 2) |
2019 | PE Elektroprivreda Srbije Beograd Branch HPP Djerdap | Delivery, installation, configuration testing and commissioning of SCADA system equipment and software for HPP Djerdap 2 |
2019 | PE Elektroprivreda Srbije, Beograd | Overhaul of the DCS in TPP Morava |
2018 | Elektromontaža Kraljevo | Delivery of equipment and works on installation of SCADA system in Košava wind farm |
2018 | AD Elektromreža Srbije, Beograd | Delivery and installation of equipment for remote access to relay protection and control devices and data archives |
2018 | Elnos BL Beograd | Reconstruction of house generator in HPP “Zvornik” |
2018 | Kaldera Company, Banja Luka | SCADA system for automatic anti-hail system |
2018 | Tehnounion-Energy doo Sremska Kamenica | Remote control system for the medium voltage network for the branch Elektrodistribucija Valjevo |
2018 | PE EPS HPP Djerdap | Equipment and software of Djerdap 1 SCADA system |
2018 | PE Elektroprivreda Srbije, Beograd | New Monitoring and control system in TPP Kostolac A1 unit |
2018 | The European Union, EU Delegation to the Republic of Serbia on behalf of the Government of Republic of Serbia | Development of remote supervision and control systems for the medium voltage distribution grid in the area of Elektrosrbija Kraljevo |
2018 | PE Elektroprivreda Srbije, Beograd | Central dispatching system – central planning system -phases 1 and 2 |
2017 | China Machinery Engineering Corporation Beograd | DCS Service and Consulting for the PHASE II of the Kostolac – B Power plant |
2019 | PE Elektroprivreda Srbije, Beograd | Technical-business information project ProTIS |
2015-2018 | GRTE Algeria | Delivery of 22 RTU with spare parts, integration, supervision and training |
2017 | PE EPS Branch TENT Obrenovac | PLC modules for VIEW6000 control system |
2017 | PE Elektroprivreda Srbije, Beograd Branch TE KO, Kostolac | Procurement and installation of power distributors and controllers MOOG on hydraulic drives |
2017 | Operator of distribution System EPS Distribucija, Beograd | Construction of the Main Dispatch Center of the ODS (Alternate National Dispatching Center) |
2017 | PE EPS, Beograd Branch Drinsko-Limske HE Bajina Bašta | Reconstruction of Power station “Metaljka” |
2017 | AD Elektromreža Srbije, Beograd | Upgrade of local and remote control systems Atlas Max-RTL |
2017 | PE EPS Branch TENT Obrenovac | Adaptation of MRC and DCS system on unit A4 |
2017 | PE EPS Branch TENT Obrenovac | Control system for all TENT units (SCADA and Web server) |
2017 | Elektroprivreda Crne Gore Nikšić, Montenegro | Reconstruction and Modernization Project of HPP “Perućica” – Reconstruction and modernization of turbine control of aggregate A5, 40MVA |
2017 | EPS PE “Elektrokosmet” | Software for SCADA control and innformation system |
2017 | PE EPS Branch TENT Obrenovac | Upgrade of Atlas Max SCADA stations |
2017 | PE Elektroprivreda Srbije, Beograd Branch HPP Djerdap Kladovo | Maintenence of the TSU equipment in HPP Vlasina |
2017 | PE Elektroprivreda Srbije, Beograd Branch HPP Djerdap Kladovo | Maintenance of the electronic devices and software upgrade in HPP Djerdap 2 |
2017 | PE Elektroprivreda Srbije, Beograd Branch HPP Djerdap Kladovo | Maintenance of SCADA system – HPP Djerdap 1 |
2017 | PE Elektroprivreda Srbije, Beograd Branch HPP Djerdap Kladovo | Remote surveilance and control on drainage systems along riverside of Djerdap 1 |
2017 | PE Elektroprivreda Srbije, Beograd Branch HPP Djerdap Kladovo | Remote control of pump stations along riverside of Djerdap 2 |
2017 | PE Elektroprivreda Srbije, Beograd Branch “Drinsko-Limske hidroelektrane Bajina Bašta | Interventions and maintenance on IMP-s equipment in DL HPP Branch |
2017 | PE Elektroprivreda Srbije, Beograd | Maintenance of the plant with PLC Pupin equipment |
2017 | PE Beogradski vodovod i kanalizacija | RTU stations on CCS facilities |
2017 | PE Elektroprivreda Srbije, Beograd | Maintenance of the monitoring and control systems PUPIN View T-Power in TPP Kolubara |
2017 | PE Elektroprivreda Srbije, Beograd | SCADA system for HPP Djerdap |
2017 | PE Elektroprivreda Srbije, Beograd | Maintenance of the SCADA system in TPP- TE-TO Zrenjanin |
2017 | PE “Rzav” Arilje | Reconstruction of the part of Control and Regulation System in the Rzav water system |
2017 | POWER GEN d.o.o. | Construction works on small HPP Vrgudinac |
2017 | PE EPS Branch TENT Obrenovac | Pump station – the inclusion of cooling pumps into the new control system |
2017 | PE EPS Distribution, Beograd | Automation in Arandjelovac branch-inclusion of Substation 35/10kV in Remote Control System and Distribution Center in Topola |
2017 | NIS | Maintenance services for the automated control of the whareouse system for year 2017 |
2016 | Elektromreža Srbije A.D. Beograd | Integration of gateway devices with local systems at production facilities, delivery of equipment, related software package, training, installation and commissioning |
2016 | PE “Beogradski vodovod i kanalizacija” | Maintenance of the Central Monitoring and Control System |
2016 | Nikola Tesla Airport Belgrade | System for Remote Control of Substations |
2016 | PE Elektromreža Srbije, Beograd | Sinoptics in RDC Novi Sad |
2016 | PE EPS Beograd Branch HPP Djerdap Kladovo | Maintenance and installation of remote control of pumping stations |
2016 | PE EPS Distribution, Beograd | Unification of operation of the distribution system operator dispatch centers – delivery and installation of equipment, licenses, software and topology, supporting works and training |
2016 | Nikola Tesla Airport Belgrade | Maintenance of the Central Monitoring and Control System |
2016 | PE Elektroprivreda Srbije Branch Panonske elektrane | Maintenance of the acquisition systems (SCADA, DATA LOGER, TSU) |
2016 | PE Elektroprivreda Srbije Branch TENT Beograd Obrenovac | PLC modules |
2016 | PE Elektroprivreda Srbije Branch TENT Beograd Obrenovac | Annual servicing of MCR DCS system in blocks TENT A1, A2, A4 and A6 |
2016 | PE for Water Supply “Rzav” Arilje | Expansion of the remote monitoring and management system in MRB “Trbušani” |
2016 | Termoelektro Enel Belgrade | Computer control of electrostatic precipitators |
2016 | PE Elektroprivreda Srbije Branch TENT Beograd Obrenovac | Adaptation of relay protection and control of 25kV generation fields and own consumption in EVP Brgule |
2016 | PE Elektroprivreda Srbije Branch TENT Beograd Obrenovac | Networking of electrical protection system on blocks A1 and A2 with DCS system |
2016 | PE “Elektroprivreda Srbije” Branch TE-KO Kostolac | Modernisation and Control of diesel electric aggregates in TEKO Kostolac B |
2016 | PE “Elektroprivreda Srbije” Branch TE-KO Kostolac | Reconstruction of control actuators on valves 1RR05C002-1RR08C008 in TE-KO B1 |
2016 | China Machinery Engineering Corporation (CMEC) | IP Telephone System and additional optical line for FGD system |
2016 | PE “Elektromreža Srbije” Belgrade | Maintenance and reconstruction of technical control system |
2016 | PE EPS Limske HPP- HPP Bistrica | Supply, installation and commissioning of a group regulator in the “Limske HPP” – HPP “Bistrica” |
2016 | EPS – Distribucija, Belgrade | Works on construction of the Main Dispatching Centre of the distribution system operator |
2016 | PE EPS Branch TENT | SCADA system (Phase II) for the cooling water pumping station at TPPNT A Obrenovac |
2016 | EPS – Distribucija, Belgrade | Modernization of measuring on 110kV substations |
2016 | PE EPS, Branch HPP Djerdap Kladovo | Software support and servicing of the remote monitoring and control system equipment – Lot 3 Maintenance of TSU |
2016 | PE EPS, Branch HPP Djerdap Kladovo | Software support and servicing of the remote monitoring and control system – for servicing of electronic devices and software upgrade HPP Djerdap 2 |
2016 | PE EPS, Branch HPP Djerdap Kladovo | Software support and servicing of the remote monitoring and control system – Maintenance of the SCADA system |
2016 | Elektroistok izgradnja | Delivery of equipment and works for the 110kV substation “Drmno” |
2015 | PE EPS – Branch TPP Kostolac | Implementation of the control system for the desulphurisation |
2015 | Elektromreža Srbije Belgrade | Upgrade of IMP SCADA system in National Dispatching Center |
2015 | PE EPS Distribucija – “Centar” Kragujevac | SCADA software – delivery and installation of equipment for supervision and control in DDC Centar Kragujevac |
2015 | PE EPS Distribucija Beograd | Reconstruction of relay protection and automation in Cacak branch |
2015 | PE EPS branch HE Djerdap Kladovo | Vibration diagnostics of turbine units |
2015 | PE EPS branch TPP-KO Kostolac | Delivery and installation of MOOG servo controller |
2015 | PE EPS Beograd | Remote supervision and control of water pumps |
2015 | “EPS Distribucija” Beograd | Delivery of SCADA systems in Ćuprija and Paraćin plants |
2015 | PE “Elektromreža Srbije” | Upgrade of local and remote control systems Atlas Max-RTL |
2015 | EPS HPP Djerdap Kladovo | Reconstruction of accumulation level measurement system |
2015 | EPS, TENT Obrenovac | Adaptation of relay protection system in EVP Brgule |
2015 | HPP Djerdap Kladovo | Spare parts for TSU, system for control, protection and monitoring in HPP Djerdap 1 |
2015 | HPP Djerdap Kladovo | Spare parts for TSU in Vlasinske HPP |
2015 | PE EPS PD TENT | Adaptation of control system in EVP Brgule |
2015 | Elektrovojvodina Novi Sad | Modernization of the existing and inclusion of the new electric power units in RCS |
2015 | Kolubara open pit mines Lazarevac | Delivery and installation of equipment for RC of pump stations for regulation of watercourses – II phase Duboki potok |
2015 | PE “Elektromreža Srbije” | Remote access to RZU and data storage |
2015 | PE “Elektromreža Srbije” | Data transmission equipment |
2014 | TPP KO Kostolac | PLC PUPIN – Spare parts for control systems |
2014 | Jugoistok Niš | Supply of RTU and implementation in TS 35/10KV |
2014 | HPP Trebisnjica, Trebinje B&H | Replacement of Control System in HPPT 2 |
2014 | Belgrade Waterworks and Sewerage | Maintenance of the remote control system |
2014 | PE Water supply Rzav Arilje | Reconstruction of SCADA system in Rzav water system |
2014 | TPP Nikola Tesla Obrenovac | SCADA system for cooling water pumping station in external facilities of TPP Nikola Tesla A |
2014 | HPP Djerdap Kladovo | Maintenance of control, protection and monitoring equipment for aggregates in Vlasinske HPP |
2014 | HPP Djerdap Kladovo | Servicing of electronic devices and software upgrade in HPP Djerdap 2 |
2014 | EPS-TPP Nikola Tesla Obrenovac | Annual maintenance of SCADA systems in TPP Kolubara |
2014 | TPP Morava Svilajnac | Repair of SCADA system |
2014 | TPP KO Kostolac | Design and consulting services – design of heating network |
2014 | TPP KO Kostolac | Delivery, installation and commissioning of new or reconstructed MRU equipment – modernization of control in dredge station |
2014 | Elektrosrbija ltd Kraljevo | Maintenance of the remote control system, UPS and registrophones |
2014 | HPP Djerdap Kladovo | Design and replacement of control boards of upper lock chambers in HPP Vrla 2,3 and 4 |
2014 | HPP Djerdap Kladovo | Reconstruction of the control system in HPP Pirot |
2014 | HPP Djerdap Kladovo | Project design of electrical installations for external objects, Lot 2, in HPP Djerdap 2 |
2014 | HPP Djerdap Kladovo | Project design for the extension of power plant control system, Lot1, for HPP Djerdap2 |
2014 | TPP KO Kostolac | Delivery, installation, connection and commissioning of the new or refurbished equipment – modernization of measuring equipment on the block B1 |
2014 | Informatika, Belgrade | Control System for cinder crutcher and lane |
2014 | PE Elektromreza Srbije Belgrade | Maintenance and software support for the Electric Power System |
2014 | PE Elektrosrbija Kraljevo | Maintenance of SCADA, SRC and PUPIN |
2014 | TPP Nikola Tesla Obrenovac | Rehabilitation of control, regulation, protection and measuring system on turboagregate TA 3 -65 MW |
2014 | PE Elektrovojvodina Novi Sad | Maintenance of the remote control system |
2014 | EPS PD Panonske TPP-THP Novi Sad | Maintenance of the acquisition systems and upgrade of the existing DCS system |
2014 | TPP Nikola Tesla Obrenovac | Adaptation of the existing Mihailo Pupin SCADA system in order to make connection to DCS of the bloc B |
2014 | TPP Nikola Tesla Obrenovac | Networking of the 6kV electrical protection and generators in control system in block A3 |
2014 | TPP KO Kostolac | Maintenance of the PLC Pupin plant |
2014 | Deneza M Engineering | Low current installation during reconstruction and upgrade of waiting rooms and finger hallways at Nikola Tesla airport (connection with SCADA system in Terminal 2) |
2014 | TPP Nikola Tesla Obrenovac | Software upgrade of DCS for TPP blocks in TPP Nikola Tesla A |
2014 | Power Distribution Belgrade | Maintenance of the SCADA system |
2014 | TPP Nikola Tesla Obrenovac | Delivery of the components for Dispatching DCS in TPP Nikola Tesla A blocks |
2014 | TPP Nikola Tesla Obrenovac | Annual maintenance of DCS Atlas view T-power |
2014 | ENERGOPROJEKT-OPREMA | Delivery of measuring, control and supervisory equipment and reconstruction works on precipitator plant in TPP Nikola Tesla A3 block |
2014 | TPP Nikola Tesla Obrenovac | Delivery of processing unit |
2014 | SOLARTEC SRB doo | Equipment and works for RP Beočin |
2014 | ALSTOM Power, Poland | Implementation of new devices and systems into DCS in Block B1 |
2014 | Siemens d.o.o. Belgrade | Delivery of equipment and works for cogeneration Velebit 3 |
2014 | HPP on Drina – HPP Visegrad | Delivery of equipment for monitoring system for three generators in HPP Visegrad |
2014 | PE Water supply Rzav Arilje | Delivery of equipment and works for expanding SCADA for two lateral connections – Prislonica and Rasna |
2014 | VOITH Hydro | Works and delivery of equipment for the reconstruction of HPP Zvornik |
2014 | PE Watter supply Rzav Arilje | Delivery of equipment and provision of services and works for expansion of the remote control system for Prislonica and Rasna connections |
2014 | EPS PD Panonske TPP-THP Novi Sad | Maintenance of acquisition systems – expansion of the control system |
2014 | PE EPS Elektrosrbija Kraljevo | SCADA system for TS 110 kV and 35/10kV control for Aranđelovac and Novi Pazar branches |
2013 | Hydro Power Plant Djerdap Kladovo | Works on automatic control and remote monitoring of the drainage systems Kovin and Knicanin |
2014 | Energoprojekt oprema Beograd | Manufacturing and supply of equipment and services for the project in Nigeria and elimination of deficiencies within the warranty period |
2013 | Elektrosrbija Kraljevo | SCADA system for control of TS 110 kV and 35/10kV for Jagodina and Kraljevo branches |
2013 | TPP KO Kostolac | Design of automation process for heating substations |
2013 | Elektrovojvodina Novi Sad | Reconstruction and expansion of remote control system on all levels |
2013 | “NIS” Novi Sad | Procurement of equipment and material – Video Wall, services and works on “turn key” bases for Dispatching center in Novi Sad |
2013 | PE Elektromreža Srbije Beograd | Study “Systems for continuous temperature monitoring of overhead power lines in EMS transmission network” |
2013 | PE EPS PD TENT | Procurement of Back up system |
2013 | Elektrosrbija Kraljevo | Procurement of goods with installation services for remote control and reconstruction of TS 35/10 Despotovac |
2013 | PD Elektrodistribucija Beograd | Construction of DC Krnjaca – infrastructural organization for the purpose of connection to a single remote control system |
2013 | PE Elektromreža Srbije Beograd | Delivery, training and final configuration of the synoptic displays in EMS facilities |
2013 | PE Elektromreža Srbije Beograd | Procurement of software, licences and commissioning of the new version of SCADA/AGC in NDC |
2013 | Hidroelektrane Djerdap Kladovo | Program support and interventions on the equipment for automatic control and remote monitoring of the pumping stations along the riverside of HPP Djerdap |
2013 | Drinsko-Limske hidroelektrane | Maintenance of the control and acquisition equipment in HPP Bajina Basta |
2013 | PE Elektromreža Srbije Beograd | Upgrade and calibrating of SCADA system for RDC Valjevo and RDC Krusevac |
2013 | Terming doo Beograd | Rehabilitation of infrastructure of reservoir R-29 as part of installation “Smederevo” |
2013 | Elektrosrbija Kraljevo | Delivery and commissioning of remote control system in TS35/10 KV Zlatiborka |
2013 | Elektrosrbija Kraljevo | Delivery and installation of remote control system in substation 35/10kV Zlatiborka |
2013 | Drinsko-Limske hidroelektrane | Reconstruction of the command board at central command after revitalization of generator in HPP Bajina Basta |
2013 | TPP Nikola Tesla | Repairment of turbine monitoring |
2013 | HPP Djerdap Kladovo | Delivery of equipment and works on replacement of generator command boards in HPP Vrla3 and adaptation of generator control system in HPP Vrla 1 |
2012 | Kaldera Company Laktasi, Republika Srpska | Replacement of Control system for DCS for HPP Trebinje 2 |
2012 | RB Kolubara –Railway Transport | Electronic Speedometer EB-96 for locomotives LEW EL3/03 |
2012 | Sever Subotica | Equipment and works for additional generators HPP “Vrla 1” installation |
2012 | Siemens doo Beograd | Delivery of equipment and works in PS Vranje 4 |
2012 | Elektrovojvodina Novi Sad | Modernization, reconstruction and extension of Remote Monitoring and Control System of electrical distribution company Elektrovojvodina, Novi Sad |
2012 | HPP Djerdap Kladovo | Customization of Command Board for the new excitation system in HPP Djerdap 2 |
2012 | HPP Djerdap Kladovo | Additional delivery of equipment and works for the replacement of generator command boards at HPP “Vrla 4” and PAP “Lisina” |
2012 | HPP Djerdap Kladovo | Integration of Spillway Dam Power supply control system with central SCADA system |
2012 | Elektrovojvodina Novi Sad | Expansion of remote control system and integration with SCADA/DMS. |
2012 | Koridori Srbije | Rehabilitation works on tunnels Lipak and Zeleznik – connection to electrical grid, on Belgrade by-pass, highway E-70/E-75 section Dobanovci-Bubanj Potok, sector 4 |
2012 | TPP KO Kostolac | Delivery, installation and commissioning of coal transportation control system |
2012 | Elektrovojvodina Novi Sad | Access control and video surveillance system in 25 substations 110/20kV |
2012 | Water works and Sewage Company Novi Sad | Delivery of racks and related equipment for remote monitoring and control system |
2012 | TPP Kolubara Veliki Crljeni | Delivery, installation and commissioning of monitoring and control systems for excavator stations on units A1-A4 |
2012 | Institute Jaroslav Cerni | Technical documentation and consulting services for construction of 8 small HPP on existing water management dams (Celije, Bovan, Barje, Vrutci, Zlatibor, Parmenac, Selova, Rovni ) |
2012 | TPP Nikola Tesla Obrenovac | Adaptation of monitoring and control system for defrosting of railroad cars on industrial railway in TPP Nikola Tesla |
2012 | TPP Nikola Tesla Obrenovac | Upgrade of alarm signalization of IMP DCS system |
2012 | TPP Morava Svilajnac | Testing and rehabilitation of SCADA system |
2012 | Elektrosrbija Kraljevo | Delivery and installation of remote control station and equipment in 35/10 kV “Takovo” Gornji Milanovac substation |
2012 | TPP Nikola Tesla Obrenovac | Design and implementation of DCS simulator in block A4 |
2012 | EMS – Public Enterprise for electric energy transmission Beograd | Delivery of SCADA software with licenses |
2012 | Elektrosrbija Kraljevo | Delivery and installation of substation automation for substations Kraljevo 5, Ladjevci, Jasen, Tehnogas, Vitanovac |
2012 | TPP Nikola Tesla Obrenovac | Annual maintenance of the MRU – DCS system in TPP NT A |
2012 | Vode Vojvodine, Novi Sad | Remote control and supervisory system for hydro technical objects |
2012 | HPP Djerdap Kladovo | Maintenance of river banks pumping stations in HPP Djerdap 1 |
2012 | Elektrosrbija Kraljevo | Delivery and installation of SS 35/10 kV “Satelitska stanica” Ivanjica substation automation. |
2012 | EPS Beograd | Design, implementation and commissioning of program modules for TIS Protis EPS – Phase I |
2012 | TPP KO Kostolac | System for tracking of vehicles and machinery in TPP Kostolac using GPS/GPRS technology with position tracking, fuel consumption and working hours tracking of vehicles and auxiliary equipment. |
2012 | HPP Djerdap Kladovo | Replacement of control board units in HPP “Lisina” and HPP “Vrla4” |
2012 | Energoprojekt Beograd | Adaptation and repairment of electro filter unit on TPP Kostolac unit B2 |
2012 | HPP Djerdap, Kladovo | Laying of power cables for new measuring well Nera in HPP Djerdap |
2011 | Elektrovojvodina Novi Sad | System of radio relay connections for remote control |
2011 | Srbijagas Beograd | Pupin Access Control System for Srbijagas, Zrenjanin |
2011 | Gemax Beograd | Delivery, installation and commissioning of equipment for measurement, control and software support for sewage pumping station Krnjača |
2011 | HIDRO TAN Beograd | Protection and management in mini HPP MHE Donje Gare |
2011 | HPP Djerdap, Kladovo | Design, delivery, installation, interconnection and commissioning of equipment for the modernization of the Central Command of HPP Djerdap 2 |
2011 | Institut za vodoprivredu Jaroslav Černi | Feasibility study of building new small Hydro Power Plants on existing dams phase I |
2011 | HPP Djerdap, Kladovo | Supplementary works for final reconstruction of the Command Board of generators HPP Vrla 1 |
2011 | Informatika Beograd | Production and delivery of electrical equipment for drainage wells and delivery, installation and commissioning of equipment for remote monitoring and control of lane well LC-XII. |
2011 | Elektrovojvodina Novi Sad | Reconstruction and Extension of SCADA system, phase IV |
2011 | TPP Kolubara Veliki Crljeni | Delivery of project for boilers 4 and 5 management system, production and delivery of equipment, supervision and commissioning |
2011 | TPP KO Kostolac | Delivery, installation and commissioning of systems for monitoring and control of coal transportation in TPP Kostolac A |
2011 | Crnogorski elektroprenosni sistem | Realization of the Project completion of the local SCADA system in SS 220/110/35 kV Podgorica 1 (Zagorič) |
2011 | Panonske termoelektrane | SCADA system extension in TPP Zrenjanin, III phase |
2011 | Elektrovojvodina Novi Sad | Delivery and installation of dynamic synoptic panel in DDC Elektrovojvodina |
2011 | TPP Nikola Tesla Obrenovac | Delivery of equipment for the reconstruction of Heating system |
2011 | Drinsko-Limske HE Bajina Bašta | Pipeline rupture protection system in HPP Bajina Bašta |
2011 | HPP Djerdap Kladovo | Installation of flow monitoring system on HPP Djerdap 1 generators |
2011 | Amiga Kraljevo | Electrical works, extension of fire protection system, integration of technical subsystems into the CSNU system and display of 6 time zones, as a part of the Terminal 2 reconstruction of Nikola Tesla Airport, Belgrade |
2011 | HPP Djerdap Kladovo | Replacement of the control panels on generator in HPP Vrla 2 and modernization of the local monitoring and control system of the Central Command |
2011 | TPP Kolubara Veliki Crljeni | Modernization of turbine governor TA 65 MW |
2011 | TPP KO Kostolac | Delivery, installation, interconnection and commissioning of new or reconstructed DCS equipment in TPP Kostolac B/RB2 |
2011 | Kaldera Company Laktasi | The adaptive design of the main project of modernization and adaptation of equipment for measurement, control and management in TPP Ugljevik |
2011 | ED Valjevo | Delivery of the equipment for the relay protection reconstruction and customization for monitoring and remote control of SS 35/10kV Valjevo 4 and SS 35/10kV UB1 |
2011 | TPP Nikola Tesla Obrenovac | Design, delivery and commissioning of the high-frequency supply system for the electric power and control of electrostatic precipitators in TPP Nikola Tesla – A |
2011 | Jugoistok Nis | Maintenance of SCADA System for three years |
2011 | EMS – Public Enterprise for electric energy transmission Beograd | Maintenance and modifications of SCADA equipment and software in EMS facilities for 3 years |
2011 | TPP Nikola Tesla Obrenovac | Maintenance of SCADA system in 2011 |
2011 | PD Čačak | Reparement of generator and automatization of SHPP Moravica in Ivanjica |
2011 | Montenegrin Transmission System | Delivery and installation of equipment for expansion of SCADA system in substation 400/220/110kV Pljevlja 2 |
2011 | TPP Nikola Tesla Obrenovac | Modernization of turbine control systems |
2011 | PD Belgrade | Expansion of remote control systems in Mladenovac and Obrenovac |
2011 | TPP KO Kostolac | Additional works on the adaptation of SCADA and auxiliary system on turbine and generator unit B2 |
2011 | HPP Djerdap Kladovo | Interventions on the equipment for automatic control and remote monitoring of the pumping stations near HPP Djerdap 1 |
2011 | EPS Beograd | Upgrade of the OS and SCADA system for electric power planning, production and trade facilities of EPS |
2011 | Elektrodistribucija Čačak | SCADA system for Substation 35/10kV Duga Poljana in Sjenica |
2011 | EMS – Public Enterprise for electric energy transmission Beograd | Upgrade and modernization of SCADA system VIEW2 at the premises of RDC Bor and MS Smederevo |
2011 | EMS Beograd | Upgrade of SW and HW in control centers for standardization of data exchange with other centers |
2010 | HPP Djerdap Kladovo | Reconstruction and modernization of Central command in HPP Djerdap 2 |
2010 | PD Čačak | SCADA in Substations 35/10kV IKG Guča, 35-10kV G.Milanovac2, 35-10kV Beršići |
2010 | HPP Djerdap Kladovo | Replacement of SCADA system in command center of office building HPP Djerdap 1 |
2010 | PD Užice | Delivery and implementation of SCADA system in Substation 35/10kV “Pora 1” and Substation 10/35kV “Susica” |
2010 | HPP Djerdap Kladovo | Delivery, installation and commissioning of electrical power drainage system Ljubicevac |
2010 | Elektrovojvodina Novi Sad | The pilot system of remote monitoring and control of medium voltage distribution network in PD Subotica |
2010 | Jugoistok Nis | Maintenance of the SCADA system in substations |
2010 | Elektrovojvodina Novi Sad | Maintenance of SCADA in power distribution area of Elektrovojvodina |
2010 | Elektrovojvodina Novi Sad | Inclusion of Substation 35/10kV Podbara in remote control system |
2010 | EMS Beograd | Implementation of the new version of SCADA SW on VIEW2 system |
2010 | Elektroprivreda Srbije | Implementation of the secondary regulation in TPP NT A I faze |
2010 | HPP Djerdap Kladovo | Reconstruction of signalization defects system on the tower locks at HPP Djerdap 1 |
2010 | TPP Kolubara Veliki Crljeni | Adaptation of the substation and switch yard 110kV in TPP Kolubara |
2010 | Elektrovojvodina N.Sad | Pilot system – SCADA on MV distributing grid in ED Sombor, second phase |
2010 | Elektrodistribucija Beograd | Maintenance of the remote control system in Power Distribution Belgrade |
2010 | HPP Djerdap, Kladovo | Connecting Vlasinske HPP to Technical Management system Electric Power Systems of Serbia |
2010 | HPP Djerdap, Kladovo | Aggregate control panel and transformers protection for blocks 2 and 3 |
2010 | Termoelektrane i kopovi Kostolac | Production and delivery of electrical equipment and DCS equipment for remote monitoring and control of lane well LC-XII. |
2010 | Panonske TE TO Novi Sad | Additional modules in DCS system of TPP/District heating Novi Sad phase III |
2010 | TPP Nikola Tesla Obrenovac | Supplementary works on DCS system ATLAS VIEW T-Power in TPP Nikola Tesla Obrenovac block A6 |
2010 | TPP Nikola Tesla Obrenovac | Supplementary works on DCS system ATLAS VIEW T-Power in TPP Nikola Tesla Obrenovac block A2 |
2010 | HPP Djerdap, Kladovo | Maintenance of automatic control and remote monitoring system of pump stations along the river bank – HPP Djerdap 1 for 2010. |
2010 | IMP-Srbijavode | Water capture control system for Bovan and Barje sources |
2010 | IMP-Energoprojekt | Delivery of equipment and works for SCADA system on dam Rovni |
2010 | Elektromreža Srbije Beograd | Reconstruction of light signals on Substation Sremska Mitrovica 2 |
2010 | Panonske termoelektrane | SCADA system extension in TPP Zrenjanin, II phase |
2010 | TPP Morava Svilajnac | Maintenance of DCS in 2010 |
2010 | TPP Nikola Tesla Obrenovac | Turbine control system for block A2 |
2010 | Elektrovojvodina Novi Sad | Reconstruction and upgrading of remote control system for Electrical Distribution Utility “Elektrovojvodina” Novi Sad- phase III |
2009 | GSP Beograd | Preparation of the detailed design, equipment, installation, testing and commissioning of integrated measurement system for the deployed power consumption in GSP Beograd |
2009 | PD Beograd | Delivery and commissioning of remote Substation N.Beograd 3 and radio system |
2009 | PD Beograd | Upgrade of SCADA VIEW 2 system |
2009 | EMS – Public Enterprise for electric energy transmission Beograd | Delivery and installation of equipment for modernization of SCADA system VIEW2 in RDC Beograd |
2009 | TPP Nikola Tesla Obrenovac | Delivery and installation of equipment and SW for measurements on Velika Morava river |
2009 | EMS – Public Enterprise for electric energy transmission Beograd | Reconstruction of SCADA system in RP Mladost |
2009 | HPP Djerdap Kladovo | Delivery of equipment and works for the control, protection and monitoring of hydro generators in HPP Djerdap I |
2009 | EPS Beograd | Design of the Integrated Data Warehouse in TPP NT Information System for decision-making and monitoring of plant production and energy efficiency |
2009 | Elnos BL Beograd | Delivery of equipment and works for Substation 35/10kV Smederevska Palanka 1 |
2009 | HPP Djerdap Kladovo | Delivery, installation and commissioning of the RTU ATLAS MAX for integration of HPP Vlasina HPP in EPS System HPP Vrla1 |
2009 | TPP Kostolac | Maintenance of the control system (software and hardware PLC ATLAS MAX) on block B1 and electrical command in TPPKO B |
2009 | Institute Nikola Tesla Beograd | Production, delivery and installation of SCADA applications for radio remote control of switching equipment on MV distribution network PD Beograd |
2009 | Energoprojekt niskogradnja | Surveillance and alert system and information system for monitoring and control of water supply system Rovni |
2009 | EMS – Public Enterprise for electric energy transmission Beograd | Delivery and installation of RTU ATLAS MAX/RTL |
2009 | TPP Kostolac | Adaptation of SCADA system on block 2 TPP Kostolac B |
2009 | Institute Jaroslav Černi Beograd | Consulting services on rehabilitation of pump stations for Belgrade Waterworks and Sewerage |
2009 | DMS GRUPA Novi Sad | Delivery of SCADA system for DC Elektro Krajina |
2009 | HPP Djerdap Kladovo | Delivery of spare parts for aggregates control panel in HPP Djerdap 2 |
2009 | Termooprema Beograd | Delivery of equipment and works for block A5 TPP Kolubara V.Crljeni |
2009 | Panonske termoelektrane | Equipment for the lower level for the second phase of modernization of the control system in TPP TO Novi Sad |
2009 | TPP Morava Svilajnac | Testing and repairing of measurement, regulation and control system |
2009 | TPP Nikola Tesla Obrenovac | Adaptation of control system ATLAS VIEW T-power on block A1 |
2009 | TPP Kolubara Veliki Crljeni | Delivery of equipment for upgrading of control workstations for turbine on Block 3, digital and analog input modules for ATLAS MAX, 0.4kV turbine distribution and local cabinets |
2009 | Flight Control Agency of Serbia and Montenegro | Software upgrade for automatic weather station AWS-200 in Batajnica |
2009 | Elektroprivreda Crne Gore Nikšić | Delivery of equipment and works for Substation Nikšić |
2009 | IMP/ Srbijavode | Reconstruction of control board and measurement and control equipment at the dam Bovan Aleksinac |
2009 | ABS Holding | Delivery of equipment and works for 5 local SCADA under the SIDA project |
2009 | Energoprojekt Beograd | Reconstruction of ashes and clay treatment system on block A5 in TPP Kolubara A |
2009 | Sports Center Vojvodina Novi Sad | Central control system and I phase of automatic control system for peak energy consumption |
2009 | TPP Nikola Tesla Obrenovac | Delivery of AMEG simulator |
2008 | Energy company Kraljevo | Delivery and commissioning of SCADA in Substations 35/10kV Hladnjača and 35/10kV Zablaće |
2008 | Panonske TPP | Design, engineering, installation of equipment, testing, training, setup and commissioning of SCADA VIEW T-POWER in TPP TO Novi Sad as part of modernization of the TPP-TO N.Sad – Phase 2 and 3 |
2008 | Elektrosrbija Kraljevo | SCADA sistem za DDC Kraljevo |
2008 | EP Crne Gore Nikšić | Delivery of equipment and works for Substation Ribarevina |
2008 | TPP Kolubara Veliki Crljeni | Design, development and engineering of SCADA system for turbo agregate TA3 |
2008 | TPP Kolubara Veliki Crljeni | Industrial computer components for adaptation of SCADA TA3 |
2008 | ABS | Delivery and installation of SCADA equipment for tunnels Lipak i Železnik |
2008 | Elektrovojvodina N.Sad | Reconstruction and upgrade of SCADA in “Elektrovojvodina” N.Sad |
2008 | Siemens Beograd | Equipment and works in Substation M.Mitrovica |
2008 | Elektrosrbija Kraljevo | Replacement of the SCADA in PD Kruševac-Plant Trstenik |
2008 | Siemens Karlsruhe | Equipment and works in HPP Perucica |
2008 | Elektrovojvodina N.Sad | Maintenance of real time SCADA in Elektrovojvodina |
2008 | ABS Minel Elektrooprema | Delivery of equipment and works in Substation 35/10kV Mlekara PD Centar Kragujevac i TS 110/6/6kV Rudnik 3 PD TE KO Kostolac |
2008 | TPP KO Kostolac | Installation and commissioning of SCADA equipment for control of well line |
2008 | EMS – Public Enterprise for electric energy transmission Beograd | Interventions and modifications of SCADA software of electric power facilities and centers of remote control in PE EMS |
2008 | JP Železnice Srbije Beograd | Delivery of SCADA equipment for Kraljevo-Čačak-Požega railway |
2008 | Elektrodistribucija Beograd | Delivery, testing and commissioning of substations Beograd 9, Galenika, Elektronska industrija, Ikarus, Aerodrom and Neimar |
2008 | Jugoistok Niš | Maintenance of the SCADA system and real time protection in PD Jugoistok |
2008 | TE Nikola Tesla Obrenovac | Delivery of computer and network equipment for DCS block A6 |
2008 | Beogradski vodovod I kanalizacija | Development of water quantity and quality measurement system in open channels based on GPRS communications with Web access for monitoring and management |
2008 | Flight Control Agency of Serbia and Montenegro | Remote control of automatic weather stations AWS-200 |
2008 | Panonske termoelektrane | Modernization of SCADA system on K3 boiler in TPP Novi Sad |
2008 | TPP Nikola Tesla Obrenovac | Maintenance of the information System in TPP Nikola Tesla Obrenovac |
2008 | TPP Nikola Tesla Obrenovac | Reconstruction of DATA LOGER for block 6 TPP NT B |
2008 | HPP Djerdap Kladovo | Continuation of works for integration of HPP Vlasina HPP in EPS System |
2008 | TPP Nikola Tesla Obrenovac | Delivery of RTU ATLAS MAX for reconstruction of block A6 |
2008 | TPP Kostolac | Adaptation of DCS for 348 MW block |
2008 | IMP / JKP – Beogradske elektrane | Rehabilitation and modernization of process control system in HP “NOVI BEOGRAD” (Phase IV) |
2007 | TPP Nikola Tesla Obrenovac | Modernization and adaptation of DCS for block A6 |
Year | Contractor | Description |
2020 | PE Putevi Srbije, Beograd | Video wall with accompanying equipment for the control-command center for toll collection control |
2020 | AŽD Saobraćajni sistemi Beograd | Subcontract on the modernization of the technical-passenger railway station Zemun – Delivery, installation and commissioning of the railway switch |
2020 | Energoprojekt oprema ad Beograd | Subcontract on the modernization of the technical-passenger railway station Zemun |
2020 | PE Elektroprivreda Srbije branch TPPNT | Modernization of SS devices at Vorbis station |
2019 | PE Putevi Srbije, Beograd | Establishing of the Toll Collection and Data Processing Center |
2019 | PE Putevi Srbije, Beograd | Project related to control of tolled highway usage – section: Beograd – Niš |
2019 | China Railway International Co. Ltd Serbia Branch Beograd | Modernization and reconstruction of Hungarian – Serbian railway connection in the territory of the Republic of Serbia, for section Belgrade Center – Stara Pazova |
2018 | Infrastruktura železnice Srbije a.d. | Rehabilitation od electro technical infrastructure on the lines of railway node Belgrade and sections Stara Pazova-Šid, Resnik-Lapovo and Mala Krsna- Velika Plana |
2018 | PE Putevi Srbije, Beograd | Installation of the closed toll collection system on highway sections: Niš – border to N. Macedonia, Niš border to Republic of Bulgaria and Obrenovac – Preljina |
2018 | PE Putevi Srbije, Beograd | Replacement of the toll collection equipment (OCR cameras, the first generation antennas and magnetic cards readers on highway sections Beograd-Šid and Beograd-Niš, old issuing machines on section Beograd- Šid) and upgrade of vehicle categorizer on all sections |
2018 | China Railway International Co. Ltd Serbia Branch Beograd | Subcontract for the Execution of the Stage Works of Signaling & Telecommunications of the Railway line between New Belgrade and Zemun Section |
2018 | PE Putevi Srbije, Beograd | Replacement of the toll collection equipment (OCR cameras, the first generation antennas and old type of issuing machines) |
2018 | PE Elektroprivreda Srbije, Branch TENT Obrenovac | Delivery of electronic speedometers for railway vehicles |
2017 | AŽD Saobraćajni sistemi Beograd | Replacement of the signal and security devices in railway station Podgorica |
2017 | Telegroup d.o.o. Banja Luka | Design, delivery and installation of toll collection system on the section Prnjavor – Banja Luka, highway Doboj-Banja Luka |
2017 | China Civil Engineering Construction Corporation – Branch Beograd | Agreement for Procurement and Deliveries of Materials and Equipment for Telecommunication and Signaling Works (Project for rehabilitation by general overhaul of the railway section Junction”G” – Rakovica-Resnik |
2017 | China Civil Engineering Construction Corporation – Branch Beograd | Subcontract for the Execution of Telecommunication and Signaling Works (Project for rehabilitation by general overhaul of the railway section Junction”G” – Rakovica-Resnik |
2017 | Vojput a.d. Subotica | Works on toll collection system – software package, installation of equipment, testing, commissioning and training of personnel Section Sirig-Subotica) |
2016 | Bombardier Transportation (Signal) Beograd | Subcontract for works on signal & security devices and telecommunications for the “Repair of the railway line Resnik – Valjevo |
2016 | Telegroup d.o.o. Banja Luka | Toll Collection System on toll collection stations Johovac and Prnjavor on Doboj-Banja Luka highway |
2016 | PE “Putevi Srbije” Belgrade | Maintenance of the Meteo – Information System (PMIS) |
2016 | PE “Putevi Srbije” Belgrade | Maintenance of ITS equipment and installations in the tunnel Zeleznik |
2016 | PE “Putevi Srbije” Belgrade | Maintenance of ITS equipment and installations in the tunnel Lipak |
2016 | PE “Putevi Srbije” Belgrade | CSU Maintenance of SCADA software for tunnel equipment on the Belgrade bypass, ring road and the command operations center “Petlovo brdo” and control center “Gazela” |
2016 | PE “Putevi Srbije” Belgrade | Toll Collection System on highway section Vladičin Han – FJR Macedonian border |
2016 | Strabag d.o.o. Belgrade | Toll collection system, video surveillance and alarm system on Vrčin toll collection station |
2016 | PE EPS – Branch RB Kolubara Lazarevac | Repair, calibration and installation of speedometer EB Mihajlo Pupin on electric locomotives LEW |
2015 | PE Putevi Srbije Belgrade | Maintenance of tunnel equipment, systems and installations |
2015 | PE Putevi Srbije Belgrade | Maintenance of the toll collection system |
2015 | BS Telecom Solutions, Sarajevo, B&H | Development of software for toll collection system in Federation of B&H |
2014 | PE Putevi Srbije Belgrade | Implementation of closed toll collection system on the highway section Stara Pazova-Sirig, by modifying an open system at toll stations Stara Pazova, Indjija, Beska, Kovilj, Novi Sad – south and Sirig and equipping of new toll collection stations Maradik and Novi Sad – north |
2014 | PE “Autoputevi Republike Srpske”, Banja Luka | Delivery, installation and maintenance of the equipment and software for the open toll collection system at E661, Gradiška – Banja Luka highway, toll station Jakupovci |
2014 | RZD International Ltd. Branch Beograd – Stari Grad/Infrastruktura Železnice Srbije | Subcontractor Agreement 01/2014 from 21.08.2014. on performance of building and installation Works: SCB and connection systems provision on the section Pančevac Bridge – Pančevo Glavna (km 4+742 – km 19+600, length 14 858 m), a part of the railroad Belgrade Center – Pančevo Glavna – Vršac – national border with Romania. |
2014 | BS Telecom Solutions; Sarajevo, B&H | Delivery of toll collection equipment and software for highway section Sarajevo-Ploče |
2014 | JP Putevi Srbije Belgrade | Paper magnetic tickets |
2013 | Kapsch TrafficCom AG Vienna, Austria | Software eGo for traffic access control to olympic facilities in Sochi, Russia (16 traffic filters |
2013 | JP Putevi Srbije Belgrade | Integration of information and communication system in traffic control center – phase 3 |
2013 | BS Telecom Solutions Sarajevo BiH | Delivery of toll collection equipment |
2013 | PE Putevi Srbije Belgrade | Additional works on modernization of the existing toll collection system on highway sections Beograd-Niš-Doljevac, Beograd-Šid and toll collection plazas Stara Pazova and Sirig |
2012 | IMP / JP Autoceste FBiH | Installation and configuration of 14 smart cameras |
2012 | JP Autoceste Federacije BiH, Mostar | Supply, installation and maintenance of equipment and software for the closed toll collection system |
2012 | IMP / JP Autoceste FBiH | Installation and configuration of 30 smart cameras |
2012 | PE Putevi Srbije Belgrade | Maintenance of the installed toll collection equipment |
2012 | PE Putevi Srbije Belgrade | Maintenance of the installed toll collection equipment on Serbian highways |
2011 | WEG TEHNOLOGY | Development, delivery, installation and commissioning of the parking system in the public garage at Strahinjic Bana street |
2010 | PE Putevi Srbije Belgrade | Additional works on modernization of toll collection system |
2010 | IMP / PE Putevi Srbije | Delivery of LPR licenses in 2010 |
2009 | PE Putevi Srbije Belgrade | Supply of electromagnetic barriers and hand held TAG readers with software |
2008-2009 | Ministry of transport and telecommunications OEBK, DE BANANA, Kinshasa, Congo | Bridge toll collection system and video surveillance |
2009 | IMP / PE Putevi Srbije | Delivery of LPR licenses in 2009 |
2008 | Univerzal Monte, Herceg Novi, Montenegro | Toll collection system / Toll collection plaza Sitnica |
2006 | Tončevgradnja doo Surdulica | Implementation of an electronic control system at the cargo customs terminal |
2008 | PE Putevi Srbije Belgrade | Maintenance of the toll collection system on Serbian highways: stretches Beograd-Leskovac, Beograd-Sid and Beograd-Subotica |
2004-2008 | Republička direkcija za puteve, Beograd | Modernization of the toll collection system on Serbian highways |
Date | Contractor | Description |
2021 | Ministry of Agriculture and Environmental Protection – Directorate for Plant Protection | Maintenance of the information system ITCM |
2021 | Ministry of Agriculture and Environmental Protection – Directorate for Agrarian Payments | Maintenance of the application and data base software for processing of national subsidies |
2017 | Ministry of Finance Republic of Serbia | Introduction of the new Register of accounting services providers |
2020 | Ministry of Finance Tax Administration Sector for Material Resources | Improvement of the taxation system for absolute rights, inheritance and gifts |
2020 | Ministry of Finance Tax Administration Sector for Material Resources | Development of new functionalities of the integrated information system of the tax administration |
2019 | Ministry of Finance Tax Administration Belgrade Headquarters | Maintenance of the tax collection and tax accounting system |
2019 | Government of the Republic of Serbia Office for Information Technology and E-Government | Improvement and upgrading of the of local tax administrations information system. |
2018 | Ministry of Finance – Directorate for Prevention of Money Laundering | Upgrade of Alfresco DCMS system |
2018-21 | Serbia and Montenegro Air Traffic Control SMATSA Belgrade | Professional and technical support in maintenance of SAWAS and SRCAVS software |
2018 | Ministry of Finance Tax Administration Belgrade | Maintenance of the business functions system |
2018 | Government of the Republic of Serbia Office for Information Technology and E-Government | Information system for local tax administration |
2018 | PE Elektroprivreda Srbije, Beograd | Integral information system for monitoring of coal production at the surface coal mines |
2017 | Standing Conference of Towns and Municipalities Serbia, Beograd | Creating a public budget portal for 10 pilot local governments |
2017 | Standing Conference of Towns and Municipalities Serbia, Beograd | Analysis of the existing budget preparation and execution system in at least 10 pilot local governments |
2017 | Ministry of Finance Tax Administration Belgrade | Maintenance of several business functions system |
2016 | Republic of Serbia Ministry of Agriculture and Environmental Protection – Department of Agricultural Payments | Maintenance of application and database software for interpretation of national grants |
2016 | Busines Registers Agency Serbia | Maintenance of the application systems of Business Registers Agency |
2015 | Ministry of Finance Tax Administration Belgrade | Migrating functionality of the integrated system UNJP to the new functionalities of the Integrated Information System |
2015 | Air Traffic Control of Serbia and Montenegro SMATSA Belgrade | Upgrade of SAWAS software |
2014 | Serbian Business Registry Agency | Delivery of integration modules and improvement of the existing compoments of information systemi |
2014 | Air Traffic Control of Serbia and montenegro SMATSA Belgrade | Upgrade of SRCAWS i SAWAS software |
2014 | PE TPP Nikola Tesla Obrenovac | Validation of electronic speedometer EB 96 |
2014 | Serbian Railway | Repair of the EB96 speedometer |
2014 | Elektrotehnički fakultet Belgrade | Software development of the visual system for flight dynamics simulator |
2014 | PE Postal Services of Serbia | Support to the process of printing and delivering of taxation |
2014 | Ministry of Finance Tax Administration | Maintenance of the “Identification and collection of public revenues” software |
2013 | Ministry of Finance Tax Administration | Establishing data base of all tax payers and declarations of tax status for individuals and companies IS |
2013 | PE Putevi Srbije | Expansion of Information and communication system- outdoor equipment phase 1 |
2013 | Serbian Business Registers Agency | Improving the functionality and Security of Business Registers Agency – Procurement and implementation of software solutions for e-Portal for ordering, purchasing and delivery of data, documents and reports |
2013 | BS Telecom Solutions Sarajevo | Development of software for sale of electronic OBU-for ENC in Bosnia and Herzegovina and reporting according to demands of Toll Collection Sector in PE Autoceste |
2013 | PE Post of Serbia | Services supporting printing and delivery of tax reports |
2013 | IMP /Tax Administration | Administration of the tax form – reduction of excise |
2013 | IMP /Tax Administration | IS Identification and collection of public revenue – Administering of tax forms for entrepreneurs and individuals in 2013 |
2013 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Improvement of the document management system – software upgrade |
2013 | IMP / Investment Agency Belgrade | Professional supervision and consultancy services in 2013 |
2013 | Standing Conference of Towns and Municipalities – Association of Towns and Municipalities of Serbia | Development of the Information system for monitoring of local finances for the project “Institutional support of SKGO” |
2013 | Serbian Business Registry Agency (BRA) | BRA e-Portal |
2012 | IMP / Investment Agency Belgrade | Professional supervision and consultancy services in 2012 |
2012 | Serbian Business Registry Agency | KAZA – Implementation of IS for HR and payroll records |
2012 | IMP / PE of PTT Communications Srbija-Ada Huja | Implementation of software solutions within LTA Information System supporting printing process and delivery records |
2012 | Serbian Business Registry Agency | Serbian Business Registry Information System Development and Safety Study |
2012 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Upgrade of Alfresco DMS solution and support to reorganization of Directorate |
2011 | Ministry of Agriculture, Trade, Forestry and Water – Administration for Agricultural Payments | Evaluation, monitoring and consulting services in the procurement process |
2011 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Software upgrade |
2011 | Ministry of Finance Tax Administration | Maintenance of ”Identification and collection of public revenue” |
2011 | IMP / Investment Agency Belgrade | Professional supervision and consultancy services in 2011 |
2011-2013 | Ministry of Finance Tax Administration | Maintenance of the Single taxpayers registry IS |
2011 | IMP /Tax Administration Belgrade | Integrated Information System for Tax Administration |
2011 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Electronic signature and OnLine warning application |
2011 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Automated receiving of structured XML data, and customizing templates for documents |
2010 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Improvement of the document management system application |
2010 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | System for document exchange with tax payers |
2010 | IMP/Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Upgrade of DMS with new functionalities |
2010 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Client application for efficient reception of paper documents |
2010 | Ministry of Finance Tax Administration | Maintenance of the Information System |
2010 | Ministry of Finance Tax Administration | Maintenance of the Information System |
2010 | Ministry of Finance Tax Administration | Additional software delivery, data initialization for the new tax payer registry |
2010 | IMP / Investment Agency Belgrade | Professional supervision and consultancy services in 2010 |
2009 | IMP / Investment Agency Belgrade | Professional supervision and consultancy services in 2009 |
2009 | Ministry of Finance Tax Administration | Software solution to support the Business sector for computer support and maintenance services of computer, communication and related equipment – LOT 3 |
2009 | Ministry of Finance Tax Administration | Software solution for reporting and risk analysis -LOT 2 |
2009 | Ministry of Finance Tax Administration | Software solution for Single tax payers registry |
2009 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Annex 4 – Installation and configuration of the production environment for the Document management system |
2009 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Annex 3 – Document and Case Management System |
2008 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Annex 2 – Creation of report on the state of the computer network of and suggestions for its improvement |
2008 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Annex 1 – Auxiliary functions of Information system of Directorate for Prevention of Money Laundering: Validation, Exchange List, List of terrorists |
2008 | Ministry of Finance and Economy – Directorate for Prevention of Money Laundering | Agreement on business and technical cooperation |
2007 | Ministry for Telecommunications and Information society | Information System of Local Tax Administration |
COMPUTER NETWORKS AND COMPUTER SYSTEMS IN LARGE INFORMATION SYSTEMS
Year | Contractor | Description |
2019 | Republički geodetski zavod | Servicing and maintenance of computer equipment, computer peripherals, LAN networks, network components and expansion of existing ICT components |
2014 | “Dijamant” AD Zrenjanin | Installation of fiber optic cables and LAN |
2014 | Republički geodetski zavod | Servicing and maintenance of computer equipment, computer peripherals, LAN networks, network components and expansion of existing ICT components |
2013 | National Employment Service | Installation and maintenance of network infrastructure |
2013 | Ministry of Justice of the Republic of Serbia | Professional supervision of installation of DATA center in the judiciary object in Nemanjina 9 |
2013 | IMP / Ministry of Justice and Public Administration | Supervision of the realization of WAN within the Directorate for Execution of Sanctions |
2012 | National Employment Agency | Structured cabling system in National Employment Agency |
2012 | IMP / Ministry of Foreign and Domestic Trade and Telecommunications | Consulting services for Ministry of Foreign and Domestic Trade and Telecommunications |
2011 | Ministry of Justice of the Republic of Serbia | Technical supervision of the implementation of the WAN in institutions within the Directorate for Execution of Sanctions / Ministry of Justice |
2011 | National bank of Serbia | Installation of the structured cabling system in the National Bank of Serbia |
2010 | Ministry of Justice of the Republic of Serbia | Preparation of technical documentation – main design of WAN |
2010 | Ministry of Justice of the Republic of Serbia | Technical supervision of implementation of the contract for procurement of services, equipment and maintenance of WAN/PN judiciary network |
2009 | Ministry of Justice of the Republic of Serbia | Main Design of WAN for Serbian judiciary |
2009 | Ministry of Justice of the Republic of Serbia | Main Design of WAN for Directorate for Execution of Sanctions |
2006 | Ministry of Defence – Military Medical Academy | Design of LAN for Military Medical Academy in Belgrade with 13746 connections |
2004 | Serbian road Directorate, Beograd, Bul. Kralja Aleksandra br. 282 | Design of the LAN for all toll plazas as part of modernization of the existing toll collectionsystem on Serbian highways |
2009 | Ministry of Defence – Military Medical Academy – VMA | Main Design of LAN in a newly renovated space for MRI in Military Medical Academy |
2008 | Republic Geodetic Authority | The main design for the installation of LAN in the Republic Geodetic Authority Cadastre Ražanj |
2008 | Republic Geodetic Authority | The main design for the installation of LAN in the Republic Geodetic Authority Cadastre Paraćin |
ACCESS CONTROL AND VIDEO SURVEILLANCE SYSTEMS
Date | Contractor | Description |
2020 | Elektromontaža doo Kraljevo | Delivery of equipment and installation of IP telephone system and part of CCTV equipment |
2019 | JP “Srbijagas” Novi Sad | Installation of access control and attendance system |
2018 | Srbijagas | Installation of access control and attendance system |
2018 | JP EPS | Maintenance of hardware and software for attendance and access control system |
2016 | TPP Kostolac | Maintenance of the equipment and software for the attendance and access control system |
2016 | Republic of Serbia Ministry of Mining and Energetics | Maintenance of the access control system |
2016 | JKP “Mladenovac” | Delivery of equipment, installation and commissioning of the access control system in JKP “Mladenovac” |
2015 | PE EPS – Drinsko-Limske hidroelektrane, Bajina Bašta | New version of attendance and access control system |
2015 | JP EPS-PD TENT | Instalation of video surveillance on electric locomotives of 441 series |
2014 | PD Drinsko-Limske hidroelektrane | Registration of work time and attendance system |
2013 | PE Elektroprivreda Srbije | Access control system in EPS facilities on turn key bases |
2013 | PE EPS-PD TENT | Maintenance of access control system |
2013 | PD Hidroelektrane Djerdap | Delivery and installation of video surveillance equipment and signal transmission to the Dispatching center in HPP Djerdap |
2011 | TPP KO Kostolac | Pupin Access Control System for TPP Kostolac |
2010 | Belgrade Fair | Pedestrian traffic control system |
2010 | JP Nuklearni objekti Srbije | Installation of video surveillance and access control |
2010 | Airport Belgrade | Parking tool collection system |
2008 | Drinsko limske HPP B.Bašta | Delivery, installation and commissioning of the access control system |
Realized systems
Year | Contractor | Description |
2020 | Kodar energomontaža Beograd | Delivery of equipment for the public alert system in the event of a flood wave for the dam “Bovan” |
2019 | JP EPS, ogranak “Drinsko-Limske hidroelektrane” | Procurement of equipment and installation of Public alert system |
2019 | Gradska uprava grada Bora | Public alert system |
2019 | Opština Stara Pazova | Alarm sirens |
2018 | Opština Ub | Public alert system |
2017 | JP EPS Ogranak “Drinsko-Limske hidroelektrane | Procurement of equipment and installation of Public alert system |
2013 | Municipality of Zrenjanin | Reconstruction of the existing public alert system |
2012 | Kaldera Company, Laktaši, Republika Srpska, B&H | Delivery of 7 Alarm stations and connection with previously delivered equipment in command center, 3rd phase |
2011 | Ministry of Defense, Republic of Algeria | Delivery, installation and commissioning of 15 sets of high performance and long range electronic sirens – 115 dB(C)/30m, with remote control desk, for Air Force and Air Defense of Republic of Algeria |
2011 | Kaldera Company, Laktaši, Republika Srpska, B&H | Delivery of Public Alert system for HPP Trebišnjica II phase |
2011 | PE “Vodovod” Vranje | Reconstruction of Public Alert System for Prvonek dam |
2011 | Joint -stock company Rudnik and flotation “Rudnik” | Reconstruction of the existing Public alert system |
2010 | Kaldera Company, Laktaši, Republika Srpska, B&H | Realization of Public Alert System for HPPTrebinje – I Phase (delivery of equipment for Municipal Center and subcenters on dams Grancarevo and Gorica) 10 alarm stations |
2010 | PE Srbijavode | Main Design of public Alert System for Barje dam |
2010 | PE Srbijavode | Main Design of Public Alert system for Bovan dam |
2010 | PE Water Supply Užice | Preliminary Design of the public alert system for town of Uzice and downstream of “Vrutci” dam |
2010 | Energoprojekt Niskogradnja | Realization of Public Alert System for ROVNI dam (Control center, sub center on Rovni dam and 24 alarm stations) |
2008 | HPP Bajina Bašta | Reconstruction and modernization of old Public Alert System delivered in 1989 (replacement of equipment in municipal center, sub center on dam and equipment in alarm stations) |
2008 | HPP Višegrad | Further extension of Public Alert System for dam Višegrad (Phase III) with 3 new alarm stations downstream. |
Year | Contractor | Description |
2019 | PE “Srbija vode” Beograd | Innovation of the main design of the flood warning and alert system at the dam “Bovan” |
2019 | Municipality Preševo | Acoustic study |
2017 | Municipality Bujanovac | Acoustic study |
2016 | Municipality Ivanjica | Acoustic study |
2017 | City of Sremska Mitrovica | Acoustic study |
2017 | JP EPS Ogranak Drinsko-Limske hidroelektrane | Design documentation for public alert system |
2017 | Municipality Ub | Acoustic study and design of radio network for Ub municipality |
2017 | Energoprojekt Entel A.D. Beograd | Consulting services for the project of alarm sirens in the Ducan area, Qatar |
2017 | Opština Ruma | Acoustic study for Ruma municipality |
2016 | DOO Hidro stena, Kraljevo | Preliminary design for Surveilance, Alert and Warning System downstream of MHE “Ušće” dam on the river Studenica |
2015 | Kodar inženjering Beograd | Main project for Surveillance, Alert and Warning System and acoustical study and radio network projects for HPP Djerdap 1 |
2015 | Municipality Lučani | Acoustic study for Lučani municipality |
2015 | Irig Municipality | Acoustic study for Irig municipality |
2015 | Vršac Municipality | Preliminary design and acoustic study for Vršac municipality |
2015 | Town of Čačak | Preliminary design and acoustic study for town Čačak |
2015 | Municipality Stara Pazova | Acoustic study for Stara Pazova municipality |
2014 | Municipality Gornji Milanovac | Acoustic study for Gornji Milanovac municipality |
2014 | PE Srbijavode | Project for relocation and revitalization of the existing alert system downstream of Brestovac dam |
2014 | Municipality Knic | Acoustic study for Knic municipality |
2010 | Joint -stock company Rudnik and flotation “Rudnik” | Preliminary Design of Public Alert System for newly defined endangered zone for dam Rudnik near G. Milanovac |
2010 | PE Water Supply Užice | Preliminary Design of Public Alert System for town Užice and down stream area of dam Vrutci |
2010 | PE Srbijavode | Main Design of Public Alert System for Bovan Dam |
2010 | PE Srbijavode | Main Design for Borje dam near Leskovac |
2009 | TPP Gacko | Main Design for dams Vrba and Klinje in TPP Gacko, Republika Srpska, B&H |
2008 | HPP Bajina Bašta | Detailed Design:Reconstruction and modernization of old 1989 Public Alert System |
2008 | HPP Trebišnjica | Main Design of Public Alert System for Trebišnjica dam near Trebinje |
Year | Contractor | Description |
2014 | INFIZ | Modernization kit for S-600 radar |
2014 | Vojska Srbije | Functional simulator of aiming device for M-84 tank |
2013 | Zastava arms | Balistic analyzer system |
2013 | Serbian Army | Ground station for UAV Pegaz |
2013 | Serbian Army | Zero series CVOJ M11 |
2011 | Iritel /Serbian Army | Surveillance radar P12 |
2009/2010 | Serbian Army | Radar station LAN |
Year | Contractor | Description |
2017 | AD Elektromreža Srbije, Beograd | Delivery of telecommunication devices for power lines PE EMS |
2017 | AD Elektromreža Srbije, Beograd | Delivery of tele-protective devices for TS Bistrica and TS Kruševac |
2017 | AD Elektromreža Srbije, Beograd | Delivery of RDL communication TZ600 |
2017 | PE Elektroprivreda Srbije Branch HPP Djerdap Kladovo | Maintenance of VF devices – Vlasinske HPP |
2015 | HPP Djerdap, Kladovo | Repair, service and maintenance of TK device in Vlasinske HPP |
2014 | GIVA Audiovisual Technologies Belgija | Design and development of GIVA AV panel |
2014 | Energomontaza Ltd Belgrade | Delivery of equipment and services in 400kV substation Jugohrom |
2014 | Energomontaza Ltd Belgrade | Delivery of equipment and services in 110kV substation Štip |
2014 | Elektrovojvodina, Novi Sad | Maintenance of registrophones in Elektrovojvodina |
2014 | Mikme | Design and development of professional blootooth microphone system for recording audio matrix |
2014 | Edata Elektronik Sanayi ve Ticaret A.S. | Development of fiscal printer |
2014 | Sauris, Germany | Delivery of 120 pieces of Q7 |
2013 | PE Elektromreža Srbije | Delivery of teleprotection terminals |
2013 | Ensico, Slovenia | Development of DEM_2X module |
2013 | EMS, Belgrade, Serbia | Delivery of interconnecting filters |
2013 | Vlasinske HPP | Maintenance of VF devices |
2013 | LAM Research, USA | Development and delivery of devices |
2013 | Roaming Networks | Delivery of TZ-600 device |
2013 | Elektrovojvodina, Novi Sad, Serbia | Maintenance of Registrofon device |
2013 | Norbris | Biowave project |
2013 | Roaming Networks | Delivery of TZ-600 devices |
2012 | EMS, Belgrade, Serbia | Delivery of TZ-600 devices |
2012 | Elektroprenos Bosnia and Herzegovina | Delivery of TZ-600 device |
2012 | Vlasinske HPP | Maintenance of VF devices |
2012 | EDB – Electro Distribution Company Belgrade | Establishing of telecommunication services for expansion of remote control system in section Mladenovac |
2012 | EDB – Electro Distribution Company Belgrade | Preventive maintenance (3 years) |
2011 | Finsoft Ltd., UK | STOS 2 development and delivery |
2011 | EDB – Electro Distribution Company Belgrade | Registrophones for Power Distribution Company Belgrade |
2011 | Elektrovojvodina, Novi Sad, Serbia | Maintenance of registrophones Elektrovojvodina |
2011 | MSC Gmbh, Nemačka | Development of nanoRISC module |
2011 | EDB – Electro Distribution Company Belgrade | Upgrade of radio modems for data transfer |
2011 | Vlasinske HPP | Maintenance of VF devices |
2010 | EMS, Belgrade, Serbia | Procurement of equipment for telecommunications systems maintenance |
2010 | Vlasinske HPP | Delivery and installation of digital VF unit with equipment for HPP Djerdap |
2010 | EDB – Electro Distribution Company Belgrade | Delivery of modems and scramblers for remote control of electric power system |
2010 | EPS, Belgrade, Serbia | Registrophones for TPP Nikola Tesla |
2010 | EMS, Belgrade, Serbia | Delivery of distance protection devices for EMS |
2010 | EPS, Belgrade, Serbia | Study of the development of the telecommunication system in Serbian power distribution company |
2010 | ACS | Development of PEC connectors |
2010 | Finsoft Ltd., UK | Development of new STOS modules |
2010 | Finsoft Ltd., UK | Production of STOS 3XGA video modules |
2009 | Elektrovojvodina, Novi Sad, Serbia | Maintenance of Registrophones Elektrovojvodina |
2009 | Serbian Ministry of Defence | Communication protection device in telephone channels |
2009 | Vlasinske HPP | Delivery of VF devices |
2009 | MUP | Delivery of Registrofon devices for Serbian Ministry of interior |
2009 | EDB – Electro Distribution Company Belgrade | Instalation of Omni-Sight display managemens system in Power Distribution Company Belgrade |
2009 | EDB – Electro Distribution Company Belgrade | Registrophones for Power Distribution Company Belgrade |
2009 | EDB – Electro Distribution Company Belgrade | Delivery of modems and scramblers for remote control of electric power system |
2009 | Vlasinske HPP | Delivery of digital VF devices |
2008 | EDB – Electro Distribution Company Belgrade | Delivery of modems and scramblers for remote control of electric power system |
2008 | EDB – Electro Distribution Company Belgrade | Delivery of modems and scramblers for remote control of electric power system |
2007 | Elektroistok izgradnja, Belgrade, Serbia | Installation of digital HF devices and signal transmission distance protection devices |
2008 | HPP Djerdap, Vlasinske HPP – Surdulica, Serbia | Delivery of two HF digital devices |
2007 | Elektroistok izgradnja, Belgrade, Serbia | Installation of digital HF devices and signal transmission distance protection devices |